Italian Queue 2014 Next
Jun 15-16
Observer: E. Sani, A. Marchetti, M. Fumana
Telescope Operator: S. Allanson
Support Astronomer: D. Thompson
Instrument: MODS/LUCI
Summary
Before the sunset heavy clouds over the dome.
At the sun set clouds at the horizon.
The sky is clear after the LUCI switch with low wind and seeing 0.7-1.0.
The LUCI detector has noise pattern related to problem with the readout (the reason is stil unknown). The pattern is even variable: sometimes there are just a cuople of stripes in top right quadrants, and some other all the quadrants are strongly affected.
Data Summary
Project_RUN |
Objects |
Filter |
ExpTime |
Notes |
Standard |
hz44 |
red grating |
- |
|
Standard |
hz44 |
dual grating |
- |
|
Bellazzini DDT |
HVC274.68+74 |
red grating |
1h |
mostly within seeing specs |
Beltran_01 |
A6 |
H2/Ks |
50m/7.5m |
within seeing specs |
Beltran_01 |
A1 |
H2/Ks |
50m/7.5m |
within seeing specs |
Telluric |
FS-148 |
H2/Ks |
|
|
Details
01:46 Bellazzini LS calibrations
- (CalibScripts) grflats_red_LS60x5x1.2.cal
1r.0001-0005
- (MODSeng) grpixflats_r.cal
1r.0006-0010
- (MODSeng) grlamps_r.cal
1r.00011-0013
02:30 The TO opens the dome
BELLAZZINI DDT
03:13 Standard red grating hz44
1r.0016-0018
- acqMODS hz44.acq
- modsAlign -r mods1r.20140616.0015.fits
- execMODS hz44.obs
03:35 Standard dual grating hz44
1r.0019-0021
1b.0001-0003
- Cirrus
- execMODS hz44_dual.obs
Wait for a darker sky
04:00 Slew to Bellazzini_46DDT
- modsAlign -l mods1r.20140616.0022.fits mods1r.20140616.0023.fits target very faint
- Try with a experimental version of modsAlign which subtract bias stripes but it doesn't work on LS masks
- Use again the standard modsAlign Finding chart too small and too deep, more time is required to check alignment
04:21 Bellazzini_46DDT SCI scripts
- execMODS HVC274.68+74_LS.acq
1r.0022-0024
- Clouds saw on guide star monitor
04:30 execMODS HVC274.68+74_1.obs
1r.0025-0026
- Due to thin cloud passing, we missed the guidestar for few minutes, the telescope was correctly tracking.
- The average seeing on the GCS is 1.2 (sometimes up to 1.4)
05.27 We ask the TO to
SWITCH TO LUCI
5:44 We are
authorized to use LUCI. Already on Beltran target A6
- executeLUCIscript A6_H2..img
luci.20140616.0001
- manual image to check the exp time on a single frame
luci.20140616.0002
- The script is not optimized, to much overhead to long exposures without switching on the sky.
06:18 executeLUCIscript A6_H2_DJT.img
luci.20140616.0003-0039
- the average seeing on the GCS (R band) is 0.8
08.05 executeLUCIscript A6_Ks_DJT.img
luci.20140616.0040-0048
- the average seeing on the GCS is 0.8
08.28 executeLUCIscript A1_H2_DJT.img
luci.20140616.0049-0050
08.38 Slew to Cresci_8
- the guider fails becausethe targets is too close to the Moon. We slew back to Beltran_01.
08.46 executeLUCIscript A1_H2_DJT.img
luci.20140616.0051-0081
- the average seeing on the GCS in between 0.7 and 0.9
10:15 * executeLUCIscript A1_Ks_DJT.img
luci.20140616.0082-0092
10:48 executeLUCIscript FS-148_H2.img
luci.20140616.0093-0097
11:00 executeLUCIscript FS-148_Ks.img
luci.20140616.0098-0102
11:10 Switch to calibrations
- Sky Ks flats off (low counts)
luci.20140616.0103-0202
- Sky Ks flats off (high counts)
luci.20140616.0215-0024
- Sky H2 flats on (high counts)
luci.20140616.0227-0236
12:11 The TO closes the enclosure
- we run dark frames for the Beltran and Cresci programs.
-- %USERSIG{MarcoFumana - 2014-06-16}%