Summary
Night duration (12 degree el twilight) 2:00 - 12:20 UT =
10 h 20m
Observing time:
10h 10min (98%)
Weather time loss:
0h 0min (0%)
technical time loss
10min (2%)
Data Summary
Project_RUN |
Objects |
Instrument |
Configuration |
ExpTime /Time_tot |
Images |
Notes |
Calibrations |
Rossi, Di Criscienzo skyflat J |
LUCI1-2 |
|
|
|
|
Epifani |
HIP83489 |
LUCI1 |
G200 zJ-HK |
|
luci1.0045-0048 (zJ) luci1.0049-0052 (HK) |
|
Epifani |
2015KZ120 |
LUCI1 |
G200 zJ |
1h/2h |
luci1.0057-0068 |
to be checked! Very high seeing in the last 4/5 images |
Epifani |
2015KZ120 |
LUCI1 |
G200 HK |
0.33/2h |
luci1.0069-0072 |
to be checked! Probably no good due to the high seeing |
Antoniucci |
V350Cep |
MODS1-2 |
Dual Grating |
0.33/0.33h |
mods1b.0001-0004 mods1r.0002-0005 mods2b.0001-0004 mods2r.0004-0007 |
completed |
Antoniucci |
Feige 110 |
MODS1-2 |
Dual Grating |
|
|
|
Belladitta |
PSOJ030 |
MODS1-2 |
Red Grating |
3/3h |
mods1r.0014-0018 mods2r.0016-0021 |
complete |
Gargiulo |
HIP10185 |
LUCI1 |
G200 zJ |
|
|
|
Gargiulo |
VAN001 |
LUCI1 |
G200 zJ |
2h/10h |
luci1.0080-0107 |
|
Giannini |
HD37397 |
LUCI1 |
G210 K |
|
|
|
Giannini |
V2775Ori |
LUCI1 |
G210 K |
0.5/0.5h |
luci1.0115-0144 |
completed |
Calibrations |
Epifani flat&arc |
Luci1 |
G200 HK |
|
|
|
Calibrations |
Antoniucci flat 0.8" |
MODS1-2 |
Dual |
|
|
|
Details
1:25 Calibrations
- skyflats in J band for Rossi and Di Crisicenzo
luci1.0021-0030
luci2.0016-0025
1:43 we slew to Epifani program
- 1:56 we send the script for the Epifani telluric HIP83489 (zJ, HK)
- acq
luci1.0038-0042
- 2:05 seeing on dimm 1.16
- sci
luci1.0045-0048
(zJ)
- sci
luci1.0049-0052
(HK)
- 2:17 we send the script for the Epifani target 2015KZ120 (zJ, HK)
- acq
luci1.0053-0056
- 2:28 seeing on dimm 1.13"
- 3:00 seeing on dimm 1.3"
- 3:19 seeing on dimm 2.5"
- 3:20 we pause the script
- 3:27 seeing 1.4" we re-start to integrate
- sci
luci1.0057-0068
(zJ)
- 3:40 seeing on dimm 2.0"
- 3:51 seeing on dimm 2.0"
- sci
luci1.0069-0072
(HK)
4:06 we switch to MODS. The seeing is no good for this program or for any other LUCI program, so we switch to MODS where we have more backup programs.
- 4:27 seeing on dimm 2.33"
4:37 we slew to the Antoniucci program
V350Cep
- 4:38 we send the script for Antoniucci target V350Cep
- 4:38 seeing on dimm 1.95"
- acq
mods1r.20191001.0025-20191002.0001
mods2r.20191002.0001-0003
- 4:48 seeing 1.56"
- sci
mods1b.0001-0004
mods1r.0002-0005
mods2b.0001-0004
mods2r.0004-0007
- we send the script for the Antoniucci telluric Feige 110
- acq
mods1r.0006-0007
mods2r.0008-0009
- sci
mods1b.0005-0007
mods1r.0008-0010
mods2b.0005-0007
mods2r.0010-0012
5:48 we slew to Belladitta program PSOJ030
- 5:50 seeing on images 1.1"
- 5:49 seeing on dimm 0.82"
- acq
mods1r.0011-0013
mods2r.0013-0015
- 6:10 seeing on dimm 0.84"
- 6:23 seeing on dimm 0.90"
- 7:08 seeing on dimm 1.31"
- sci
mods1r.0014-0018
mods2r.0016-0021
7:25 on avergae, the seeing is good. We switch to LUCI.
- 8:02 problems with check pointing
8:18 we slew to Gargiulo program VAN001
- 8:18 we send the script for the Gargiulo telluric HIP 10185
- 8:24 seeing on dimm 1.14"
- acq
luci1.0073-0075
- sci
luci1.0076-0079
- 8:29 we send the script for the Gargiulo target VAN001
- 8:30 seeing 1.4"
- acq
luci1.0080-0083
- 8:40 seeing on dimm 0.91". We start the integration
- 9:01 seeing on dimm 0.95"
- 9:16 seeing on dimm 0.73"
- 9:33 seeing on dimm 0.65"
- 9:42 seeing on dimm 0.64"
- 9:46 we send the script again
- 10:14 seeing on dimm 0.65
- 10:34 seeing on dimm 0.93"
- 10:38 seeing on dimm 1.17"
- 10:42 seeing on dimm 1.14"
- 10:46 seeing jumps from 1.1 to 1.6. check the last two images.
- sci
luci1.0084-107
10:52 we slew to Giannini program
V2775Ori
- we send the script of Giannini Telluric HD37397
- 10:57 seein on dimm 1.44"
- for some not clear reasons the telluric alignement is not successuful. We repeat it twice, then we decide to skip to the target and in the meanwhile fix the problem with the telluric
- 11:05 we send the script of the Giannini target V2775Ori
- 11:07 seeing on dimm 1.32"
- acq
luci1.0111-0114
- 11:13 seeing on dimm 1.19"
- 11:21 seeing on dimm 1.04"
- 11:35 seeing on dimm 1.11"
- 11:50 seeing on dimm 0.87"
- sci
luci1.0115-0144
- 12:02 we send the Telluric again
- acq
luci1.0148-0150
- 12:19 seeing on dimm 0.93"
- sci
luci1.0151-0154
Calibrations
- Flat for Epifani G200 HK slit 1"
luci1.0155-0164
- Arc for Epifani G200 HK slit 1"
luci1.0165-0170
- Flat for Antoniucci slit 0.8"
mods1b.0008-0013
mods1r.0020-0025
mods2b.0008-0013