-- AndreaRossi - 05 Jun 2019

INAF queue observing, 2019 June 04 - 05

Observer: A. Rossi
Telescope Operator: D. Gonzalez-Huerta
Support Astronomer: B. Rothberg (on call)
Instrument: LBC

At the sunset the sky is cloudy. We start with MODS.

Summary

  • This night is shared with SOUL commissioning

Night duration (12 degree el twilight) 3:25 - 07:07 UT = 3 h 42m.

Observing time: h min (0%)

Weather time loss: 3h 42min (100%)

technical time loss h *min (0%)

Data Summary

Project_RUN Objects Instrument Configuration ExpTime /Time_tot Images Notes
calibration slitflat MODS1+2 1as redgrating   ==mods1r.20190605.0002-07 ; mods1r.20190605.0002-07 Moretti
calibration bias MODS1+2 bias3k+8k   mods1r.0008-0017, mods1b.0001-11; mods2r.0008-0017, mods2b.0001-0011 Moretti
calibration slitless flat MODS1+2 redgrating   mods1r.0018-22 ; mods2r.0018-22 Moretti
calibration arcs MODS1+2 redgrating   mods1r.0023-0025;==mods2r.0023-0025== Moretti
calibration slitflat MODS1+2 5as redgrating   mods1r.0026-29, mods1b.0012-14; mods2r.0026-29, mods2b.0012-14 Moretti std
calibration slitflat MODS1+2 0.8as dualgrating   mods1r.0030-34, mods1b.0015-17; mods2r.0030-34, mods2b.0015-17 Antoniucci
calibration slitflat MODS1+2 5as dualgrating   mods1r.0035-37, mods1b.0018-23; mods2r.0035-37, mods2b.0018-23 Antoniucci

Details

03:25 still cloudy, dome closed
  • MODS calibrations for Moretti and Antoniucci

05:00 some clouds, but we open.
  • 05:15 problems with MODS setup

05:40 clouds again, TO does not feel confident to open. We stay closed

07:07 END . Telescope to SOUL commissioning
Topic revision: r1 - 31 Jul 2024, UnknownUser
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback