INAF LBC+MODS queue observing and AO PISCES, 2012 June 21-22
Observer: C. Arcidiacono, R. Briguglio, K. Boutsia, M. Faccini, F. Vitali
Telescope Operator: S. Allanson
Support Astronomer: D. Thompson
Instrument: LBC + PISCES
Summary
Clear skies at the beginning of the night and the average wind is 6m/s.
The night is dedicated to Pisces. We open up early (1:30UT) to do narrow band flats.
The seeing and the wind have been decent for the whole night.
No major problems with the AO system. Once the msgd crashed and they had to restart the secondary. We also had a couple of "shell rips" but we did not loose a lot of time.
Three more projects were completed tonight with Pisces.
At the end of the night, during twilight, we switched to LUCI to get some calibration frames in J and Ks of M15, for an older AO project.
Data Summary
Project_RUN |
Objects |
Filter |
ExpTime |
Notes |
Fiore |
Mrk231 |
J, Ks |
20min+sky / 2min Ks |
COMPLETED |
Barbieri |
KIC10864656 |
J,H,Ks |
~4min x fliter + sky |
COMPLETED |
Ragazzoni |
PCygni |
FeII, 2.14um, Ks |
~30min x filter/ 5min Ks + sky |
COMPLETED |
Bono |
M15 |
J,Ks |
3min x filter |
calibrations with LUCI for an AO project |
Details
01:30 2.14continuum flats with Pisces
03:15 Telescope is collimater and we can send the first preset (Fiore - Mrk231)
- dimm seeing 1.1" - GCS seeing 1.1"
- loop closed
03:26 start with science block
- failed during offset - have to close the loop manually
03:29 send the preset again
- the quality of the first images was not very good
- we had to manually adjust the autogain
03:40 repeat block of images
03:43 no star on the guider for an offset position - but the loop is closed so we keep taking data
04:04 the loop opened but we are taking sky frames
04:21 once we offset back tothe target, it finds the star on the pyramid, the loop closes and we can go on
05:01 ACE preset to go back to the target after the sky frames
05:04 not Wavefrontsensing - power cycle the AZcam server again??
05:15 send preset again with autocollimate - now it seems to be working
05:35 we obtain also a block of Ks images because the seeing is better than the previous nights.
05:50 preset cancelled because the shell ripped!!
05:57 send active preset for calibration star AO534
06:17 Slewing to Barberi (KIC1086)
- preset cancelled because the shell ripped
- MessageDemon off-line
06:32 problem solved - sending a preset
06:43 science block starts
- we take also some longer exposures (10sec) where the center is slightly saturated
07:24 Slew to PCygni (Ragazzoni)
- test images to decide the dither pattern
07:59 we start the science block
08:18 loop open - try to close it manually
08:28 loop opened
08:31 loop closed again - we start the script again with less offsets
08:45 send the offset with 30deg rotations
08:47 wrong PA in the sent offset
08:57 start science block at 30deg
09:39 acquireRef failed while we were sending a preset in track mode
10:03 sky frames for the PCygni project (Ragazzoni)
10:14 SWITCH TO LUCI
10:20 Slew to M15 for photometric calibration frames with LUCI
10:28 start script for J band - 10 sec exposures
luci.20120622.0003.fits-0015.fits
- dimm seeing 1.0" - GCS seeing 0.6"
10:45 start script for Ks band - 5sec exposures
luci.0016-0028
- images on Luci are elongated
11:00 start script for J band - 5sec exposures
luci.0029-0041
11:13 start script for Ks band - sky frames a bit offset
luci.0042-0054
11:28 start Ks flats (low - 2000counts)
luci.0055-0064
11:32 J flats (low -1000counts/high -5000counts)
luci.0065-0084
11:55 start Ks flats (high - 5000counts)
luci.0085-0094
11:58 park telescope at zenith to get the Pisces flats ( J,H,Ks)
12:25 pisces stopped while we were taking flats - telnet connection is not responding
12:55 send scripts for darks (both for LUCI and Pisces)
13:26 END OF RUN!!
--
KonstantinaBoutsia - 22 Jun 2012