INAF LBC+LUCIFER queue observing, 2010 April10-11
Observer: A. Fontana, K.Boutsia, R. Speziali
Telescope Operator: D.Gonzales Huerta
Support Astronomer: D. Thompson
Instrument: LBC
Summary
Clear night but not photometric.
30 minutes lost because of problems with the rotator
30 minutes lost because interface got blocked. We had to do : LBC kill - LBC restart
2.5h lost because of guiding star failure. The problem was due to the expired IDL licence. A. di Paola modified the script and we went on without AO utility
Data Summary
Project |
Objects |
Filter |
ExpTime |
Notes |
Giallongo |
Q0933 |
r-SLOAN |
1.5h |
some exposures are done without guiding |
Ferraro |
n5466 |
B-bessel |
~1.8h |
|
Ferraro |
n5466 |
r-SLOAN |
~1.8h |
|
Calibration |
BD+26 |
Us, g, r |
|
probably saturated |
Details
01:46 - Bias
- 5Bias_Bino_5
- 5Bias_Bino_rot90 - 2 times because problems with the mirror
- 5Bias-Bino_rot180
- 5Bias-Bino_rot270
02:00 - Pointing for flats
- Flat script in binocular mode STD_Usp and r-SLOAN (P.A 0 and P.A 180)
02:40 - Slew to Q0933 (Giallongo) - correct pointing near the field
02:49 - Slew again to Q0933 (Giallongo) - dofpia
- Blue fails to converge, too big ficus corrections and exits
- we apply z7=-3000, z4=+15000, z11=+1000
- fail again
- dofpia, /Blueonly -> it converges with values z7~-1000 and z4~+2000
03:22 - dofpia - binocular
03:26 - preset to Q0933 - start OB (0.5h)
04:19 - Pointing correction - PROBLEMS WITH POINTING
- correct rotator center not written in the header - ptadjust - mirroradjust
04:56 - Slew to Q0933 - dofpia
04:59 - Start integration Q0933
- interface got blocked after 4th exposure
- we had to restart interface by doing : LBC kill - LBC restart
05:38 - dofpia - after recovery from LBC crash
05:43 - Trackers are giving errors - reboot LBC
05:55 - Preset to Q0933 - repeat OB
06:00 - Images look out of focus - Abort OB for collimation
06:03 - Preset to Q0933 - repeat OB
- NOT guiding - Abort OB
- Still giving tracker errors - ERROR: RPC Client/Host communication failed retval:5 [src/trackers/trackers.c:1728]
- reboot LBC
06:18 - dofpia
06:23 - Q0933_Usr-SLOAN_2.ob - repeated
- guide star failed
- Call Andrea Di Paola!!!
06:47 - Blue arm disabled - repeat Q0933 OB with Red only
- guiding failed again but we do not interrupt OB
07:54 - Andrea found that the problem is due to the EXPIRATION OF THE IDL LICENSE! The IDL routine called by
LBCIARUN.EXE was opening a pop up window that hung all the processes. So Andrea
changed the name of the LBCIARUN.EXE not to call IDL anymore. It introduced a non critical error but allowing us to go on even if without the AO utility.
Start an Q0933 OB with the Blue arm only for test.
* LBC kill - LBC start before the test OB
08:18 - Preset to Ferraro n5466_f1_1 - dofpia
08:25 - Exposure - n5466_f1_1
08:42 - Exposure - n5466_f1_2
08:57 - Exposure - n5466_f1_3
09:05 - Abort OB because there is condensation on the RED camera.
- close shutter for 5 minutes and wait for air flow to clear the camera
- Roberto goes to check camera in the dome
09:35 - Test image at the horizon - everything seem to be working
- we changed exposure time in the Ferraro OBs - 200x4 instead of 400x2 (RED) / 410x2 instead of 400x2
09:45 - dofpia
09:50 - repeat n5466_f1_3 OB
- OB executed with new exposure times
10:08 - Exposure - n5466_f1_4
- OB executed with new exposure times
10:25 - dofpia
10:31 - Exposure - n5466_f1_5
- OB executed with new exposure times
10:48 - Exposure - n5466_f2_1
- OB executed with new exposure times
11:05 - dofpia
11:09 - Exposure - n5466_f2_2
- OB executed with new exposure times
11:26 - Exposure - n5466_f2_3
- OB executed with new exposure times
11:44 - dofpia
11:49 - Exposure - n5466_f2_4
- OB executed with new exposure times
- OB has to be repeated - out of specifics
12:05 - Slew to Photometric Standard - BD+26Usg_r.ob
12:13 - Slew to Photometric Standard - G138_31_UsB_r.ob
- aborted because saturated
- both standards seem to be saturated
12:27 - Sky Flats in B-bessel and r-SLOAN
- counts are somewhat low but enough
12:40 - End of night
--
VincenzoTest - 11 Apr 2010