INAF queue observing, 2025 Dec 15 - Dec 16

Observer: Andrea Rossi, Ester Marini
Support: Jason Chu
Telescope Operator: Steve Allanson
Instrument: LBC/SHARKs

Summary

These observations have been performed in C-19 mode by Andrea Rossi and Ester Marini .
At sunset the sky is clear. We start with LBC and then switch to SHARK-VIS/NIR at 05:05UT. We have to stop the observations and close at 07:18UT due to a glycol lead on the DX ASM. Steve calls the night at 12:05UT.

Night duration (12 degree - twilight) 1:15 - 13:15 UT = 12h 0m
Observing time: 7h 13min (%)*
Weather time loss: 0h 0min (%)*
Technical time loss: 4h 47min (%)*
Shark-VIS+NIR time loss: 0h 0min (%)*

Data Summary
Project_RUNSorted ascending Objects Instrument Configuration ExpTime /Time_tot Notes
           
           
CALIB skyflats LBC r,z   PA0,180 DONE
CALIB skyflats LBC g,Ibes   g needs PA 180
Calib Gamma_Ori SHARK-VIS     for setup
Cusano halo1 LBC BV 0.9h+0.9h BV7+BV9 script FWHM~0.7"
Cusano halo1 LBC BI 0.7+0.6h BI8+ metà BI10 FWHM~0.7"
Garufi HD34700 SHARK-VIS+NIR R-bessel+BB_H   stopped due to glycole leak on DX ASM. SNIR took 77% of scientific data, SVIS not sufficient data. PSF reference is missing, too. See log for details
Further details in the log by LBT-Italia at this link: https://drive.google.com/file/d/1J9ASz4foTMXOwuZteia4zipApmgEhZXc/view?usp=sharing

Further details in the log by LBTO at this link: https://drive.google.com/file/d/1LI3s5hcZoq2sU-OsOma7eJ-muUfCtDMS/view?usp=sharing

Summary of LBC calibration files: https://drive.google.com/file/d/14xEuqj4j0Q-rGfJB_3VkB3cm6qN7EdJ7/view?usp=sharing

Summary of LBC science files: https://drive.google.com/file/d/1BzNzYI1BWYDhNTBBn7gaFZB36sNzpSm5/view?usp=sharing
Topic revision: r9 - 17 Dec 2025, FeliceCusano
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback